Getting more basement floor than we thought we would. Vacuuming the rocks to get all the last bits off before the pour, and the in-floor heat tubing is down.
Getting the vapour barrier and a thermal break between where concrete will be and the rocks.
Backfilling the driveway side about two thirds back…
That big pile of sand now beside the house 🙂
We are still trying to find someone to take the rest of our clay so we can get the footings for the garage in and the driveway dug out as well.